Evocus High Precision Fully-Auto Video Measuring Machine EVA Series
Evocus Fully-auto Video Measuring Machine provide high accuracy with less error measurement software and intelligent illumination by MSP Metrology (M) Sdn Bhd from Evocus Korea
Features
EVA Series
High Precision Fully-auto Video Measuring Machine
High Accuracy
≤ 2.2 + L/200µm
Less Error
Within 2µm
Auto Measurement
Fast Operation of Measurement
Auto-Focus
Reduce Time & Effort
Advance Software
EV Measuring
State-of-the-Art Structure
High precision optical grating ruler from the world’s top brand from Germany, Heidenhain with the accuracy of 0.001mm. High accuracy that comes with great stability.
High precision Grade 00 granite base and column, with stable expansion of the physical properties, to ensure high stability and accuracy.
Precision linear guide, grinding ball screw and three-axis servo motor to ensure smooth operation and precise positioning. The motor is noise-free during operation.
High Resolution Images and Intelligent Illumination
High definitive automatic continuous zoom lens and high resolution color digital camera, to ensure clear image without distortion.
With programmable 4-ring 8-division LED cold illumination and contour LED parallel illumination and internal intelligent light adjustment, it can automatic control the brightness of the light.
EV Measuring Software
Professional Measuring Software
EV Measuring is a professional multisensor measuring software which combined with the developers years of experience in the measuring and software research industry. The design principle is friendly operation, powerful function, high accuracy and stability, simple maintenance.
- Excellent software architecture design and fully objectoriented, to ensure the software is stable and reliable.
- Professional SPC statistical analysis software connected to measuring software, to realize that the data could automatically export to SPC database without manual operation.
- With powerful edge finder algorithm, which can help to get the edge of the shadow or dark image and ensure high accuracy
- Support with multiple language, no need to install language pack and change the software which is convenient to local customers.
- The same model of software will be permanent free to update, it can help to reduce other trouble to customer.
- The software could automatically recognize and measure line, circle, arc and other elements.
Video
Specifications
| Model | EVA-2010 | EVA-3020 | EVA-4030 |
| X/Y-Axis Travel | 200 x 100mm | 300 x 200mm | 400 x 300mm |
| Glass Table | 260 x 160mm | 360 x 260mm | 460 x 360mm |
| Workbench | 360 x 260mm | 460 x 360mm | 560 x 460mm |
| Dimension (W x D x H) | 725 x 580 x 1070mm | 825 x 580 x 1070mm | 960 x 710 x 1090mm |
| Load Capacity | 35kg | 35kg | 35kg |
| Net Weight | 160kg | 190kg | 270kg |
| Z-axis Travel | High Precision Linear Guide, working travel 200mm | ||
| X/Y/Z-Axis Resolution | 0.001mm;Â Â Optional 0.0001mm | ||
| X/Y-Axis Accuracy | X/Y-Axis Accuracy: ≤ 2.2 + L/200 (µm); Z-Axis Accuracy: ≤ 4 + L/50 (µm) [L= Length (mm)] | ||
| Repeatability | 2µm | ||
| Main Structure | High Stability Grade 00 Granite | ||
| Grating Structure | Heidenhain (GERMANY) RSF high precision grating scale, with the accuracy of 0.001mm | ||
| Motor | Three-axis Servo Motor; Optional: Joystick | ||
| Illumination System (Programmable) | Surface: Stepless Adjustable 4-ring 8-division LED Cold Illumination | ||
| Contour: LED Parallel Illumination | |||
| CCD | High Resolution 520TV Color CCD Camera (SONY Sensor) | ||
| Motorized Zoom Lens | MT High Resolution Automatic Zoom Stereo Lens | ||
| Magnification: 0.7X ~ 4.5X;Â Video Magnification: 30X ~ 225X | |||
| Working Distance | 90mm | ||
| Field-of-View | 10.6 – 1.6mm;  Optional Lens 0.5X & 2X | ||
| Measuring Software | EV Measuring | ||
| Power Supply | 220V ±10% (AC) 50Hz | ||
Optional Accessories
Touch Probe
After the equipment is installed with probe, it can be used to measure the following parameters:
- Height, width, length
- The angle between the two sides
- Vertical angle of cone
- Diameter of cylinder
- Chamfer
- Straightness, flatness, roundness, cylindricity
- Verticality, parallelism, inclination, and so on.
Coaxial Light Source with Different Effect
Joystick
Part Accessories
4-ring 8-division LED Surface Illumination
LED Parallel Contour Illumination
Zoom Lens
Video Capture Card
CCD Camera
Calibration Glass Stage
Data Integration Box
Software Dongle
Workbench
Computer System
Linear Scale
AV Cable

